Repairs program

Annual repairs plan in 2011

Equipment

JSC “Yenisei Territorial Generating Company (TGC-13)”

Planned

Turbine units, items/MW

6/650

Including energy units, items/MW

2/270

Turbine generators, items/MW

6/735

Boiler units, items/MW

10/2935

Hot water boilers, items/Gcal/h

2/200

Replacement of heating surface area, t

1402,94

Heating systems, km

26,16

Repairs of roofs, m2

21607

Repairs of smokestacks, items

6

Realization of annual repairs plan in 2010

Equipment

 

JSC “Yenisei Territorial Generating Company (TGC-13)”

Planned

Actual

Realized (in %)

Turbine units, items/MW

8/686

8/686

100

Including energy units, items/MW

3/405

3/405

100

Turbine generators, items/MW

8/1194

8/1194

100

Boiler units, items/MW

16/4205

16/4205

100

Hot water boilers, items/Gcal/h

2/200

2/200

100

Replacement of heating surface area, t

901,027

909,581

100,9

Heating systems, km

25,193

28,554

113,3

Repairs of roofs, m2

15608

17386

111,4

Repairs of smokestacks, items

2

2

100

Realization of annual repairs plan in 2009

Equipment

JSC “Yenisei Territorial Generating Company (TGC-13)”

 

Planned

Actual

Realized (in %)

Turbine units, items/MW

7/890

7/890

100%

Including energy units, items/MW

2/535

2/535

100%

Turbine generators, items/MW

8/1153

8/1153

100%

Boiler units, items/MW

11/3105

11/3105

100%

Hot water boilers, items/Gcal/h

1/100

1/100

100%

Replacement of heating surface area, t

341,535

381,279

111,6%

Heating systems, km

25,072

26,055

103,9%

Repairs of roofs, m2

12431

12699

102,2%

Repairs of smokestacks, items

1

1

100%

Realization of annual repairs plan in 2008

Equipment

JSC “Yenisei Territorial Generating Company (TGC-13)”

Planned

Actual

Realized (in %)

Turbine units, items/MW

6/577

6/577

100

Including energy units, items/MW

2/270

2/270

100

Turbine generators, items/MW

6/695

6/695

100

Boiler units, items/MW

12/2,645

12/2,645

100

Hot water boilers, items/Gcal/h

2/200

2/200

100

Replacement of heating surface area, t

202,3

386.1

190.8

Heating systems, km

14.836

22.004

148.3

Repairs of roofs, m2

15,069

16,227

107.7

Repairs of smokestacks, items

4

4

100

Repairs of cooling towers, items

1

1

100

2007 annual repair plan outturn

Equipment

JSC “Yeniseiskaya TGK (TGK-13)”

Plan

In fact

% completion

Turbosets, pcs./MWt

4/490

4/490

100

incl. power generating units, pcs./MWt

2/270

2/270

100

Turbogenerators, pcs./MWt

3/445

3/445

100

Boiler units, pcs./t/h

12/3130

12/3130

100

Hot water boilers, pcs./Gcal/h

2/200

2/200

100

Heating surface replacement,t

146,2

228,1

156,0

Power transformers, pcs./MVA

4/256

4/256

100

Heat network, km

15,759

20,741

131,6

Roofing repair,m2

17735

17839

100,6

Smokestack repair, pcs.

7

7

100

Cooling tower repair, pcs.

2

2

100

Fulfilment of annual repairs program in 2006

Equipment

OJSC "Krasnoyarsk Generation"

OJSC «Khakass Generating Company»

Planned

In fact

% of fulf.

Planned

In fact

% of fulf.

Turbosets, pc. / MW

8 / 661

8 / 661

100

1/100

1 / 100

100

Incl. power units, pc. / MW

3 / 360

3 / 360

100

 

 

 

Turbine generators, pc. / MW

8 / 831

8 / 831

100

1 / 120

1/120

100

Boiler units, pc. / tons/h

10 / 2345

10 / 2345

100

2/840

2/840

100

Water boilers, pc. / Gcal/h

1 / 100

1 / 100

100

 

 

 

Heating surface replacement, tons

172,4

343,22

199,08

27

27

100

Power transformers, pc. / MVA

3 / 81,5

3/81,5

100

 

 

 

Heat networks, km

11,747

20,022

174,5

1,596

1,596

100

Roof mending, ì2

23 000

24609

106,9

965

965

100

Chimney mending, pc.

4

4

100

1

1

100

Cooling-tower repair, pc.

 

 

 

1

1

100



Note:

1. “Equipment” column includes only capital and medium repairsof major equipment.
2. Major equipment current repairs are carried out in full measure according to the repairs schedule.
Ìåòàäèçàéí