Annual repairs plan in 2011
|
Equipment |
JSC “Yenisei Territorial Generating Company (TGC-13)” Planned |
|
Turbine units, items/MW |
6/650 |
|
Including energy units, items/MW |
2/270 |
|
Turbine generators, items/MW |
6/735 |
|
Boiler units, items/MW |
10/2935 |
|
Hot water boilers, items/Gcal/h |
2/200 |
|
Replacement of heating surface area, t |
1402,94 |
|
Heating systems, km |
26,16 |
|
Repairs of roofs, m2 |
21607 |
|
Repairs of smokestacks, items |
6 |
Realization of annual repairs plan in 2010
|
Equipment
|
JSC “Yenisei Territorial Generating Company (TGC-13)” |
||
|
Planned |
Actual |
Realized (in %) |
|
|
Turbine units, items/MW |
8/686 |
8/686 |
100 |
|
Including energy units, items/MW |
3/405 |
3/405 |
100 |
|
Turbine generators, items/MW |
8/1194 |
8/1194 |
100 |
|
Boiler units, items/MW |
16/4205 |
16/4205 |
100 |
|
Hot water boilers, items/Gcal/h |
2/200 |
2/200 |
100 |
|
Replacement of heating surface area, t |
901,027 |
909,581 |
100,9 |
|
Heating systems, km |
25,193 |
28,554 |
113,3 |
|
Repairs of roofs, m2 |
15608 |
17386 |
111,4 |
|
Repairs of smokestacks, items |
2 |
2 |
100 |
Realization of annual repairs plan in 2009
|
Equipment |
JSC “Yenisei Territorial Generating Company (TGC-13)” |
||
|
Planned |
Actual |
Realized (in %) |
|
|
Turbine units, items/MW |
7/890 |
7/890 |
100% |
|
Including energy units, items/MW |
2/535 |
2/535 |
100% |
|
Turbine generators, items/MW |
8/1153 |
8/1153 |
100% |
|
Boiler units, items/MW |
11/3105 |
11/3105 |
100% |
|
Hot water boilers, items/Gcal/h |
1/100 |
1/100 |
100% |
|
Replacement of heating surface area, t |
341,535 |
381,279 |
111,6% |
|
Heating systems, km |
25,072 |
26,055 |
103,9% |
|
Repairs of roofs, m2 |
12431 |
12699 |
102,2% |
|
Repairs of smokestacks, items |
1 |
1 |
100% |
Realization of annual repairs plan in 2008
Equipment |
JSC “Yenisei Territorial Generating Company (TGC-13)” |
||
Planned |
Actual |
Realized (in %) |
|
Turbine units, items/MW |
6/577 |
6/577 |
100 |
Including energy units, items/MW |
2/270 |
2/270 |
100 |
Turbine generators, items/MW |
6/695 |
6/695 |
100 |
Boiler units, items/MW |
12/2,645 |
12/2,645 |
100 |
Hot water boilers, items/Gcal/h |
2/200 |
2/200 |
100 |
Replacement of heating surface area, t |
202,3 |
386.1 |
190.8 |
Heating systems, km |
14.836 |
22.004 |
148.3 |
Repairs of roofs, m2 |
15,069 |
16,227 |
107.7 |
Repairs of smokestacks, items |
4 |
4 |
100 |
Repairs of cooling towers, items |
1 |
1 |
100 |
2007 annual repair plan outturn
Equipment |
JSC “Yeniseiskaya TGK (TGK-13)” |
||
Plan |
In fact |
% completion |
|
Turbosets, pcs./MWt |
4/490 |
4/490 |
100 |
incl. power generating units, pcs./MWt |
2/270 |
2/270 |
100 |
Turbogenerators, pcs./MWt |
3/445 |
3/445 |
100 |
Boiler units, pcs./t/h |
12/3130 |
12/3130 |
100 |
Hot water boilers, pcs./Gcal/h |
2/200 |
2/200 |
100 |
Heating surface replacement,t |
146,2 |
228,1 |
156,0 |
Power transformers, pcs./MVA |
4/256 |
4/256 |
100 |
Heat network, km |
15,759 |
20,741 |
131,6 |
Roofing repair,m2 |
17735 |
17839 |
100,6 |
Smokestack repair, pcs. |
7 |
7 |
100 |
Cooling tower repair, pcs. |
2 |
2 |
100 |
Fulfilment of annual repairs program in 2006
Equipment |
OJSC "Krasnoyarsk Generation" |
OJSC «Khakass Generating Company» |
||||
Planned |
In fact |
% of fulf. |
Planned |
In fact |
% of fulf. |
|
Turbosets, pc. / MW |
8 / 661 |
8 / 661 |
100 |
1/100 |
1 / 100 |
100 |
Incl. power units, pc. / MW |
3 / 360 |
3 / 360 |
100 |
|
|
|
Turbine generators, pc. / MW |
8 / 831 |
8 / 831 |
100 |
1 / 120 |
1/120 |
100 |
Boiler units, pc. / tons/h |
10 / 2345 |
10 / 2345 |
100 |
2/840 |
2/840 |
100 |
Water boilers, pc. / Gcal/h |
1 / 100 |
1 / 100 |
100 |
|
|
|
Heating surface replacement, tons |
172,4 |
343,22 |
199,08 |
27 |
27 |
100 |
Power transformers, pc. / MVA |
3 / 81,5 |
3/81,5 |
100 |
|
|
|
Heat networks, km |
11,747 |
20,022 |
174,5 |
1,596 |
1,596 |
100 |
Roof mending, ì2 |
23 000 |
24609 |
106,9 |
965 |
965 |
100 |
Chimney mending, pc. |
4 |
4 |
100 |
1 |
1 |
100 |
Cooling-tower repair, pc. |
|
|
|
1 |
1 |
100 |
Note:
1. “Equipment” column includes only capital and medium repairsof major equipment.
2. Major equipment current repairs are carried out in full measure according to the repairs schedule.