Yenisei ÒGC (ÒGC-13)
Home pageFeedbackSite map

 
About the Company
Company News
Production
Production Structure
Main Operating Characteristics
Production and consumption of electric power
Production and consumption of heat power
Fuel Expenditure
Work on wholesale market
Fuel Balance Structure
Technical re-equipment
Repairs program
Investment Program: narrative and major events
To Shareholders and Investors
To Clients
Contacts
Main Page » Production » Main Operating Characteristics

Core Performance Details of JSC “Yenisei TGC (TGC-13)”

Installed capacity (as of 10.03.2011)

Branch

Installed electric power capacity, MW

Installed heat capacity, Gcal/h

Krasnoyarsk CHP-1

481

1,677.0

Krasnoyarsk CHP-2

465

1,405.0

Krasnoyarsk CHP-3

-

442.0

Nazarovo SDPP

1,210

870.0

Minusinsk CHP

85

330.4

Kansk CHP

24

325.0

Krasnoyarsk CHP-4

-

486.0

Abakan CHP

270

625.0

Krasnoyarsk Heating system
(electric boiler-houses)

891,82

Electric boiler-houses on the balance of Minusinsk CHP

140.7

JSC “Yenisei TGC (TGC-13)” total:

2,535

7192,92



Note 1. Since 20.03.2009 Sosnovoborsk CHP branch has been renamed to be Krasnoyarsk CHP-4.
Note 2. Since 01.02.2011, in connection with reconstruction of turbine PT-80 of Minusinsk CHP the plant installed electric and thermal power capacity has changed. The installed electric power capacity is 85 MW while installed thermal power capacity is 330.4 Gcal/h.
Note 3. Since 10.03.2011, following the results of engineering actions taken, the installed thermal cower capacity of the “Krasnoyarsk Heating Network” branch electric boiler houses has increased to be 891.82 Gcal/h.

Heating Networks Extension (in Two-Pipe Estimate)
Branch Heating networks extension, km
Total Bulk Locality
Krasnoyarsk Heating Network 498.973 193.252   305.721
     Including Krasnoyarsk City 460.133 189.396  270.737
     Divnogorsk City 38.840 3.856       34.984
Nazarovo GRES (Nazarovo City) 58.805 26.447       32.358
Minusinsk CHP 79.878 33.715      46.163
     Including Minusinsk City 55.66 33.715      21.945
     Tes Settlement 16.528 16.528
     Ilyichevo Settlement 7.69 - 7.69
Kansk CHP (Kansk City) 1.363 1.363 -
Abakan CHP (Abakan City) 58.383 38.866           19.517
Total within
JSC “Yenisei TGC (TGC-13)”
697.402 293.643 403.759