Core Performance Details of JSC “Yenisei TGC (TGC-13)”
Installed capacity (as of 10.03.2011)|
Branch |
Installed electric power capacity, MW |
Installed heat capacity, Gcal/h |
|
Krasnoyarsk CHP-1 |
481 |
1,677.0 |
|
Krasnoyarsk CHP-2 |
465 |
1,405.0 |
|
Krasnoyarsk CHP-3 |
- |
442.0 |
|
Nazarovo SDPP |
1,210 |
870.0 |
|
Minusinsk CHP |
85 |
330.4 |
|
Kansk CHP |
24 |
325.0 |
|
Krasnoyarsk CHP-4 |
- |
486.0 |
|
Abakan CHP |
270 |
625.0 |
|
Krasnoyarsk Heating system |
|
891,82 |
|
Electric boiler-houses on the balance of Minusinsk CHP |
|
140.7 |
|
JSC “Yenisei TGC (TGC-13)” total: |
2,535 |
7192,92 |
Note 1. Since 20.03.2009 Sosnovoborsk CHP branch has been renamed to be Krasnoyarsk CHP-4.
Note 2. Since 01.02.2011, in connection with reconstruction of turbine PT-80 of Minusinsk CHP the plant installed electric and thermal power capacity has changed. The installed electric power capacity is 85 MW while installed thermal power capacity is 330.4 Gcal/h.
Note 3. Since 10.03.2011, following the results of engineering actions taken, the installed thermal cower capacity of the “Krasnoyarsk Heating Network” branch electric boiler houses has increased to be 891.82 Gcal/h.
Heating Networks Extension (in Two-Pipe Estimate)
| Branch | Heating networks extension, km | ||
|---|---|---|---|
| Total | Bulk | Locality | |
| Krasnoyarsk Heating Network | 498.973 | 193.252 | 305.721 |
| Including Krasnoyarsk City | 460.133 | 189.396 | 270.737 |
| Divnogorsk City | 38.840 | 3.856 | 34.984 |
| Nazarovo GRES (Nazarovo City) | 58.805 | 26.447 | 32.358 |
| Minusinsk CHP | 79.878 | 33.715 | 46.163 |
| Including Minusinsk City | 55.66 | 33.715 | 21.945 |
| Tes Settlement | 16.528 | - | 16.528 |
| Ilyichevo Settlement | 7.69 | - | 7.69 |
| Kansk CHP (Kansk City) | 1.363 | 1.363 | - |
| Abakan CHP (Abakan City) | 58.383 | 38.866 | 19.517 |
|
Total within JSC “Yenisei TGC (TGC-13)” |
697.402 | 293.643 | 403.759 |