Investment Program: narrative and major events
Priority investment projects
Investment Program for the Development of Heat Networks in Krasnoyarsk
Events Chronicle
To Shareholders and Investors
To Clients
Contacts

JSC “Yenisei TGC (TGC-13)” Priority Investment Projects

List of JSC “Yenisei TGC (TGC-13)” Priority Investment Projects

No. Project Goal Lead-in capacity Implementation terms
1 Construction of Power Unit No. 1 of Krasnoyarsk CHP-3 Reduction of forecast deficit of thermal energy in Krasnoyarsk, improvement of the energy system operation reliability 185/220 MW and 270 Gcal/h Supply of fresh capacity – since 01.01.2012
2 Assembly of Steam Turbine No. 4 at Abakan CHP Plant installed capacity increase 120 MW Supply of fresh capacity – since 01.10.2013
3 Reconstruction of Unit No. 7 of Nazarovo GRES Reconstruction of Plant No. 7 unit aimed to eliminate the existing installed capacity utilization limitations which will be equivalent to a 400 MW capacity and installed capacity increase by 15 MW 415 (+15) MW Supply of fresh capacity – since 01.11.2012
4 Reconstruction of Turbine ÏÒ – 80 of Minusinsk CHP Electric and thermal energy cost reduction, improvement of consumer heat supply reliability 85 (+5) MW 10.12.2010
5 Technical re-equipment of Turbine Unit No. 2 of Kansk CHP Plant capacity increase and cost reduction per unit of production 12 (+7) MW 30.06.2009


Description of Core Investment Projects
Core technical and economic indicators performance of project
“Construction of Power Unit No. 1 of Krasnoyarsk CHP-3”


The project implementation goal is reduction of deficit of thermal energy in Krasnoyarsk, improvement of the energy system operation reliability.
Design Performance


Indicator Performance
Installed average annual electric power in heat-extraction / condensation mode, MW 185/200
Installed thermal power capacity, Gcal/h 270
Electric power usage hours, h 6,568
Thermal power usage hours, h 6,568
Auxiliary power consumption, % 9.0
Specific reference fuel consumption:  
- for electric energy supplied, g/kW*h 286.0
- for thermal energy supplied, kg/Gcal 171
Installation net effervesce, % 42.0


Equipment Involved in the Project


Equipment designation Productive capacity,
electric power
Parameters of steam, water
Power boiler of Plant No. 1 Åï-670-13,8-545ÁÒ
(ÒÏÅ-216)
670 t/h with intermediate superheating 140 kg/cm2 545°Ñ
Steam turbine of Plant No. 1 Ò-185/220/12,8-1 185/220 MW 130 kg/cm2 540°Ñ
Electric generator Ò3ÔÏ-220-2Ó3 220 MW  


Core Technical and Economic Indicators Performance

of the Project for Assembly of Steam Turbine No. 4 at Abakan CHP

The project is being implemented within the framework of discharge of obligations under power supply contracts.

The investment project implementation goal consists in increase of the plant installed capacity and of the amount of electric energy generation and thermal energy supply.

The investment project implementation will result in increasing installed electric power capacity of Abakan CHP by 120 MW to be 390 MW. The installed thermal power capacity will increase by 100 Gcal/h to be 725 Gcal/h. The plant operation economic performance will increase substantially.

This investment project implementation will enable solution of the following tasks:
- provision for delivery of the required capacity into the wholesale electric energy market;
- increase of JSC “Yenisei TGC (TGC-13)” share in the electric and thermal energy market;
- enhancement of competitive ability in the electric and thermal energy market.

Abakan CHP expansion envisages construction of a new 120 MW unit equipped with a steam turbine of Type Ò-120/136-12,8-8ÌÎ, a generator of Type ÒÂÔ – 125-2Ó3 and a boiler with a 500 t/h steam production rate. Additionally, one is to undertake reconstruction of the process water supply system and the electric power supply circuit as well as construction of a second fuel delivery line.

Equipment designation Productive capacity, electric power Parameters of steam, water
Power boiler of
Plant No. 1 Åï-670-13,8-545ÁÒ (ÒÏÅ-216)
670 t/h with intermediate superheating 140 kg/cm2
545°Ñ
Steam turbine of
Plant No. 1 T-185/220/12.8-1
185/220 MW 130 kg/cm2
540°Ñ
Electric generator
Ò3ÔÏ-220-2Ó3
220 MW  


Specific Fuel Consumption Performance

Indicator Current plant performance Performance after the new turbine commissioning
Specific reference fuel consumption for thermal energy supply, kg of reference fuel/Gcal 141.22 138.63
Specific reference fuel consumption for electric energy supply, kg of reference fuel/kW•h 313.71 274.09
Annual natural fuel consumption, thousand ton of natural fuel 1,127.87 627.12*


* - in case of the turbine operating without capacity limitations
Core Technical and Economic Indicators Performance of the Project

for Reconstruction of Unit No. 7 of Nazarovo GRES


The project is being implemented within the framework of discharge of obligations under power supply contracts.

The project implementation goal consists in reconstruction of Plant No. 7 unit aimed to eliminate the existing installed capacity utilization limitations which will be equivalent to the installed capacity and installed capacity increase by 15 MW.

Reconstruction of Plant No. 7 unit of Nazarovo GRES is to result in increase of installed capacity to be 415 MW and provision for reliable and failure-free operation of the equipment.

The Plant No. 7 unit core equipment includes: a boiler unit of Type Ï-49 (Ïï 1600/255Æ) (double-furnace, straight-flow, total steam production rate = 1630 t/h); a turbine of Type Ê-500-240; a turbogenerator of Type ÒÃÂ-500-2 and other auxiliary equipment.

An array of actions has been planned within the framework of the unit reconstruction project implementation:

• Reconstruction of Turbine Ê-500-240. Reconstruction of boilers 7À, 7Á involving replacement of heating surfaces, setting and insulation, boilers switchover to the low-temperature turbulent technology of fuel combustion.
• Modernization of Unit No. 7 automated process control system.
• Reconstruction of the unit transformer involving replacement of 3 phases.
• Central coal pulverizing plant equipment reconstruction.

Core Technical and Economic Indicators Performance of Project

“Reconstruction of Turbine ÏÒ-80 Minusinsk CHP”


The project implementation goal consists in electric and thermal energy cost reduction and improvement of consumer heat supply reliability

Design Performance


Indicator Performance
Installed average annual electric power in heat-extraction mode, MW 85
Electric power usage hours, h 7,889
Auxiliary power consumption, % 12.6
Specific reference fuel consumption:  
- for thermal energy supplied, kg/Gcal 148
- for electric energy supplied, g/kW*h 314
Installation net effervesce, % 42


Equipment Involved in the Project


Equipment designation Productive capacity, electric power Parameters of steam, water
Turbine Unit
ÏÒ-85/105-130/13-1Ì
85 MW 130 kg/cm2,
550°Ñ


Core Technical and Economic Indicators Performance of Project

“Technical Re-Equipment of Plant No. 2 Turbine Unit of Kansk CHP”


The project implementation goal consists in increase of quality and reliability of consumer thermal and electric energy supply and improvement of efficiency of CHP thermal and electric power capacities utilization.

Design Performance


Indicator Performance
Installed average annual electric power in heat-extraction mode, MW 12
Installed thermal power capacity, Gcal/h 78
Electric power usage hours, h 6,600
Auxiliary power consumption, % 4
Specific reference fuel consumption:  
- for thermal energy supplied, kg/Gcal 145.9
- for electric energy supplied, g/kW*h 307.8
Installation net effervesce, % 42


Equipment Involved in the Project


Equipment designation Productive capacity, electric power Parameters of steam, water
Steam turbine of Plant No. 2 Ð-12-3,4/0,5-1 12.5/13.2 MW 3.4 MPa
435°Ñ
Electric generator ÒÏÑ-12-2ÅÓ3 12 MW  
Ìåòàäèçàéí