Yenisei ÒGC (ÒGC-13)
Home pageFeedbackSite map

 
About the Company
Company News
Production
Investment Program: narrative and major events
To Shareholders and Investors
To Clients
Service Territory
Structure of consumers
Tariffs
Contacts
Main Page » To Clients » Tariffs

Tariffs 2008

Tariffs 2009

Tariffs 2010

Tariffs of JSC “Yenisei TGC (TGC-13)” for 2011

Prices for Power and Electric Energy Produced Using a Generating Facility Supplying Power and Electric Energy in Forced Mode for 2011


No. of item

Wholesale electric energy market actor

Names of generating facilities

Price for electric energy, RUB/MWh (VAT excluded)

Price for power, RUB/MWh (VAT excluded)

15

JSC “Yenisei Territorial Generating Company (TGÑ-13)”

Abakan CHP

483.30

126,368.00

Kansk CHP

444.73

126,368.00

Krasnoyarsk CHP-1

423.31

126,368.00

Minusinsk CHP

480.55

126,368.00

Nazarovo GRES

493.35

126,368.00



Tariffs for Thermal Energy for Consumers of Joint-Stock Company “Yenisei Territorial Generating Company (TGÑ-13)” (Krasnoyarsk)


No. of item

 

Thermal energy tariffs

Hot water

Pressure bleed steam

Superheated and reduced steam

2.5–7.0 kg/cm2

7.0–13.0 kg/cm2

1

Consumers paying for production and transmission of thermal energy

 

Single-rate, RUB/Gcal

826.88

706.56

706.31

773.93

 

Double-rate

 

 

 

 

 

For energy, RUB/Gcal

-

-

-

-

 

For power, thousand RUB monthly/Gcal/h

-

-

-

-

 

Population (tariffs quoted inclusive of VAT) <1>

 

Single-rate, RUB/Gcal

975.72

 

 

 

 

Double-rate

 

 

 

 

 

For energy, RUB/Gcal

-

-

-

-

 

For power, thousand RUB monthly/Gcal/h

-

-

-

-

2

Consumers paying for production of thermal energy (receiving thermal energy at producers’ manifolds)

 

Single-rate, RUB/Gcal

608.78

483.23

486.93

528.45

 

Double-rate

 

 

 

 

 

For energy, RUB/Gcal

-

-

-

-

 

For power, thousand RUB monthly/Gcal/h

-

-

-

-

 

Population (tariffs quoted inclusive of VAT) 

 

Single-rate, RUB/Gcal

718.36

 

 

 

 

Double-rate

 

 

 

 

 

For energy, RUB/Gcal

-

-

-

-

 

For power, thousand RUB monthly/Gcal/h

-

-

-

-



Tariffs for Thermal Energy for Consumers of Joint-Stock Company “Yenisei Territorial Generating Company (TGÑ-13)” (Krasnoyarsk) since 01.01.2011


No. of item

 

Thermal energy tariffs

Hot water

Pressure bleed steam

Superheated and reduced steam

2.5–7.0 kg/cm2

7.0–13.0 kg/cm2

1.1

Consumers paying for production and transmission of thermal energy

1.1.1

Budget consumers

1.1.2

Single-rate, RUB/Gcal

826.88

706.56

 

 

1.2.1

Other consumers

1.2.2

Single-rate, RUB/Gcal

826.88

706.56

706.31

773.93

2.1

Consumers paying for production of thermal energy (receiving thermal energy at producers’ manifolds)

2.1.1

Budget consumers

2.1.2

Single-rate, RUB/Gcal

608.78

483.23

 

 

2.2.1

Other consumers

2.2.2

Single-rate, RUB/Gcal

608.78

483.23

486.93

528.45



Note. Cost of services for thermal energy transmission is defined as the difference between the tariffs set for consumers paying for production and transmission of thermal energy and tariffs set for consumers paying for production of thermal energy (receiving thermal energy at producers’ manifolds).

Tariffs for Services of Thermal Energy Transmission across Networks of Joint-Stock Company “Yenisei Territorial Generating Company (TGÑ-13)” (Krasnoyarsk) since 01.01.2011


Name of enterprise services are provided to

Tariffs, RUB/Gcal/hour/month

LLC “KraMZEnergo”

68,837.56



Tariffs for Thermal Energy Produced by Abakan CHP Branch of JSC “Yenisei TGC (TGC-13)” for 2011


 

Thermal energy tariffs

Hot water

Pressure bleed steam

Superheated and reduced steam

2.5–7.0 kg/cm2

7.0–13.0 kg/cm2

Consumers paying for production of thermal energy

Budget consumers

Single-rate, RUB/Gcal

478.19

 

285.83

 

Other consumers

Single-rate, RUB/Gcal

478.19

 

285.83

 



Tariffs for Thermal Energy for Abakan CHP branch of JSC “Yenisei TGC (TGC-13)” for 2011


 

Thermal energy tariffs

Hot water

Pressure bleed steam

Superheated and reduced steam

2.5–7.0 kg/cm2

7.0–13.0 kg/cm2

Consumers paying for production of thermal energy

Budget consumers

Single-rate, RUB/Gcal

620.43

 

700.28

 

Other consumers

Single-rate, RUB/Gcal

620.43

 

700.28

 



Cost of Chemically Purified Water for Heating Networks Feeding (Krasnoyarsk Territory) for 2011


Set by the Energy-Supplying Organization

Name of populated locality

Cost, RUB/t

Krasnoyarsk 

2.91

Berezovka Settlement

2.91

Divnogorsk

29.33

Sosnovoborsk

18.69

Kansk

9.20

Nazarovo

13.60

Minusinsk

12.31

Tes Settlement

8.41

Ilyichevo Settlement

10.07

Shushenskoye Settlement

34.30



Cost of Chemically Purified Water for Heating Networks Feeding (Republic of Khakassia) for 2011


Set by the Energy-Supplying Organization

Name of populated locality

Cost, RUB/t

Abakan

8.02



Cost of Chemically Desalinized Water for Boiler Feeding for 2011


Set by the Energy-Supplying Organization

Heating source name:

Cost, RUB/t

Krasnoyarsk CHP-1

37.24

Krasnoyarsk CHP-2

116.47

Krasnoyarsk CHP-4

26.28

Kansk CHP

45.72

Nazarovo GRES

95.90



Tariffs for Cold Water for 2011


Name of populated locality

Tariff, RUB /m3, VAT included

Minusinsk

39.75

Tes Settlement

4.79

Ilyichevo Settlement

5.09

Sosnovoborsk

6.84



Official publication source “Journal of Supreme State Authority Bodies of the Krasnoyarsk Territory”, “Nash Krasnodarsky Kray” newspaper

JSC “Yenisei TGC (TGC-13)” Tariff for Connection to the Heat Supply System for 2011–2012


JSC “Yenisei TGC (TGC-13)” tariff for connection to the heat supply system has been approved in an amount of 5,871.37 thousand RUB/Gcal/h of connected capacity (VAT excluded).

JSC “Yenisei TGC (TGC-13)” tariff for connection of newly created (reconstructed) facilities to the heat supply system has been approved in an amount of 5,871.37 thousand RUB/Gcal/h of connected capacity (VAT excluded).

Payment for Connection to the Abakan Heat Supply System


The payment for connection to the Abakan heat supply system to the extent of thermal energy sources and heating networks of Abakan CHP branch of JSC “Yenisei TGC (TGC-13)” has been approved in an amount of 8,963,805.1 RUB per 1 Gcal/h, for other persons – 7,596,445.0 RUB per 1 Gcal/h.
Ìåòàäèçàéí